Great Eastern Main Line

From Wikipedia, the free encyclopedia

Template:Short description Template:Redirect Template:Multiple issues Template:Use dmy dates Template:Use British English

Template:Infobox rail line Template:Great Eastern Main Line RDT

The Great Eastern Main Line (GEML, sometimes referred to as the East Anglia Main Line) is a Template:Convert major railway line on the British railway system which connects Template:Rws in central London with destinations in east London and the East of England, including Template:Rws, Template:Rws, Template:Rws, Template:Rws and Template:Rws. Its numerous branches also connect the main line to Template:Rws, Template:Rws, Template:Rws, Template:Rws and a number of coastal towns including Template:Rws, Template:Rws, Template:Rws and Template:Rws.[1]

Its main users are commuters travelling to and from London, particularly the City of London, which is served by Liverpool Street, and areas in east London, including the Docklands financial district via the London Underground and Docklands Light Railway connections at Template:Rws. The line is also heavily used by leisure travellers, as it and its branches serve a number of seaside resorts, shopping areas and countryside destinations. The route also provides the main artery for substantial freight traffic to and from the Port of Felixstowe and Harwich International Port, via their respective branch lines. Trains from Template:Rws also run into London via the GEML.[2]

The Elizabeth line, which was fully opened in November 2022, operates services from Shenfield to Template:Rws, via Liverpool Street, connecting Essex with Central and West London. Additionally, it provides a direct rail link between the GEML and the Great Western Main Line.

History

Template:See also

Eastern Counties and Eastern Union Railways (1839–1862)

The first section of the line, built by the Eastern Counties Railway (ECR), opened in June 1839 between a short-lived temporary terminus at Template:Rws in the East End of London and Template:Rws, then in the Havering Liberty in Essex. The London terminus was moved in July 1840 to Shoreditch (later renamed Bishopsgate), after 1900 in the Metropolitan Borough of Bethnal Green, and at the eastern end the line was extended Template:Convert out to Template:Rws in the same year. A further Template:Convert of track was added out to Template:Rws by 1843.[3] The original gauge for the line was Template:Track gauge, but this was converted to Template:Track gauge in 1844.

The section of line between Colchester and Template:Rws was built by the Eastern Union Railway (EUR) to standard gauge and opened to passenger traffic in June 1846. Its sister company, the Ipswich and Bury Railway, built a line to Template:Rws and this was completed in November 1846. Both companies shared the same office, many directors and key staff; it started operating as a unified company with the EUR name from 1 January 1847. An extension from a new junction at Template:Rws to Template:Rws opened in December 1849, although the position of the latter station was poor and a spur to allow some trains to operate into Template:Rws (Thorpe) station was opened to regular traffic in November 1851.[4]

In the late 19th century, the double-tracked main line was expanded with additional tracks being added to cope with more traffic. In 1854, a third track was added between Bow Junction and Stratford to help accommodate London, Tilbury and Southend Railway services which at that time were operating via Stratford.

Until 1860, trains serving the town of Ipswich used a station called Template:Rws which was located south of the Stoke tunnel. The town's current station is located to the north of the tunnel.

The ECR had leased the EUR from 1854 but by the 1860s, the railways in East Anglia were in financial trouble and most were leased to the ECR; they wished to amalgamate formally, but could not obtain government agreement for this until 1862, when the Great Eastern Railway (GER) was formed out of the consolidation.[5]

Great Eastern Railway (1862–1922)

From November 1872, Template:Rws became a temporary terminus to relieve the main high level Bishopsgate station while the GER was building its new permanent terminus at Liverpool Street. The latter opened in stages from February 1874, beginning with the first four platforms, until it was fully open from November 1875. At that time, the original 1840 Bishopsgate station closed to passengers and was converted into a goods yard.

By the 1870s, suburbia in the Forest Gate area was developing quickly and, in 1872, suburban trainsTemplate:Efn terminated at a bay platform at Template:Rws. These were followed by trains from Fenchurch Street in 1877.Template:Efn By 1882, these services had been extended and were terminating at Ilford, Romford or Brentwood.

In 1877, a fourth track was added between Bow Junction and Stratford and two goods-only tracks were added between Stratford and Maryland Point. This section was extended back to James Street JunctionTemplate:Efn in 1884, but Bethnal Green to James Street did not follow until 1891. It was also in this year that two extra tracks were added between Bethnal Green and Liverpool Street, which were for the use of West Anglia Main Line services. These tracks were built through the basement warehousing associated with Bishopsgate station located above.

The line was quadrupled to Ilford in 1895 and out to Template:Rws in 1899.

In 1902, the quadruple track was extended from Seven Kings to Romford, but it was not until 1913 that four-tracking out to Template:Rws was suggested; the First World War caused delay to this plan.[6] In 1903, the Fairlop Loop opened and a number of services that had previously terminated at Ilford were extended onto it. These services generally looped round and back to the GEML at Stratford (on the Cambridge line platforms).

London and North Eastern Railway (1923–1947)

The GER was grouped in 1923 into the London and North Eastern Railway (LNER). In 1931-32, the LNER quadrupled the tracks to Shenfield which became the terminus for inner-suburban operation.

In the 1930s, a flyover was constructed just west of Template:Rws to switch the main and electric lines over, to enable main line trains to utilise Liverpool Street's longer west side platforms without having to cross east side suburban traffic in the station throat. The new arrangement also facilitated cross-platform interchange with the Central line at Stratford, with services commencing in 1946. Either side of the Ilford flyover there are single-track connections between each pair of lines, with the westbound track extending to Template:Rws and just beyond. The eastbound track extends as far as Ilford station. It was also envisaged that a flyover would be built at the country-end of the carriage sidings at Template:Rws to allow trains bound for the Southend Line to change from the main line to the electric line, instead of at the London-end of Shenfield as they do now.

Plans were drawn up in the 1930s to electrify the suburban lines from Liverpool Street to Shenfield at 1,500 V DC and work was started on implementing this. However, the outbreak of the Second World War brought the project to a temporary halt and it was not until 1949 that the scheme was completed with electrification being extended to Template:Rws in 1956.[7]

During the war, the long-distance named trains were withdrawn; these returned afterwards with the reintroduction of the "Hook Continental" and "Scandinavian" boat trains to Harwich Parkeston Quay in 1945. The East Anglian (Liverpool Street – Norwich) was restored in October 1946, and in 1947 the "Day Continental" which pre-war had operated as the "Flushing Continental", recommenced operation.[8]

British Railways (1948–1994)

After nationalisation in 1948, the GEML formed part of the Eastern Region of British Railways.

The Summer 1950 timetable saw the introduction of a regular interval service between Liverpool Street and Clacton, which left Liverpool Street on the half-hour and Clacton on the hour. Summer Saturdays in 1950 also saw the introduction of the Holiday Camps Express workings to Gorleston, near Lowestoft. The latter half of 1950 and early 1951 saw the testing of new EM1 electric locomotives for use over the Woodhead Line between Manchester London Road and Template:Rws.[9]

January 1951 saw the introduction of the Britannia class 4-6-2 express locomotives and a speeding up of services on the GEML. However, not everyone was a fan; British Railways' chairman Sir Michael Barrington Ward exclaimed "What? Send the first British Railways standard engines to that tramline? No!"Template:Citation needed[10]

Twenty-three Britannias were allocated to the GE section and, in summer 1951, the Liverpool Street–Norwich service went over to an hourly clockface interval service.[11][12]

The British Railways 1955 Modernisation Plan called for overhead line systems in Great Britain to be standardised at 25Template:NbspkVTemplate:NbspAC. However, due to low clearances under bridges, the route was electrified at 6.25Template:NbspkVTemplate:NbspAC. The section between Liverpool Street and Southend Victoria was completed in November 1960. Extensive testing showed that smaller electrical clearances could be tolerated for the 25Template:NbspkV system than originally thought necessary. As a result, it was now possible to increase the voltage without having to either raise bridges or lower the tracks along the route to obtain larger clearances. The route between Liverpool Street and Southend Victoria was converted to 25Template:NbspkVTemplate:NbspAC between 1976 and 1980.[13]

By the late 1970s, the costs of running the dated mechanical signalling systems north of Colchester was recognised and, in 1978, a scheme for track rationalisation and resignalling was duly submitted to the Department of Transport. This was followed by a proposal, in 1980, to electrify the remainder of the Great Eastern Main Line.[14]

The early 1980s saw track rationalisation and signalling work carried out in the Ipswich area and, on 9 April 1985, the first electric train consisting of two Template:Brc electric multiple units (EMUs) worked into Ipswich station. The previous year, another member of the class had been dragged to Ipswich by a diesel locomotive and was used for crew training. The first passenger-carrying train was formed of Template:Brc EMUs, which ran on 17 April 1985.

InterCity electric-hauled trains commenced on the route on 1 May 1985. Template:Brc electric locomotives initially only powered services between Liverpool Street and Ipswich; after a switchover, Template:Brcs would complete the journey between Ipswich and Norwich. This last section was finally energised in May 1987, when through electric services commenced.[15]

In 1986, the line as far as Template:Rws became part of the Network SouthEast sector, although some NSE services actually terminated at Ipswich, whilst longer-distance Norwich services were operated by InterCity. Local services operating from the Ipswich and Norwich areas were operated by Regional Railways.

Privatisation era (1994 onwards)

Template:Refimprove section Between 1997 and 2004, services into Essex and some into Suffolk were operated by First Great Eastern, whilst services into Norfolk and other Suffolk services were operated by Anglia Railways. Between 2004 and 2012, services out of Liverpool Street, except for a limited number of c2c trains, were all operated by National Express East Anglia. Since 2012, the franchise has been operated by Greater Anglia; in May 2015, the Shenfield metro stopping service transferred to TfL Rail, as a precursor to Elizabeth line services.

Liverpool Street IECC replaced signal boxes at Bethnal Green (closed 1997), Bow (closed 1996), Stratford (GE panel closed 1997), Ilford (closed 1996), Romford (closed 1998), Gidea Park (closed 1998), Shenfield (closed 1992) and Chelmsford (closed 1994). The system uses BR Mark 3 solid state interlockings, predominantly four-aspect signals and a combination of Smiths clamp-lock and GEC-Alsthom HW2000 point machines.

The first signal box to be closed and transferred to Liverpool Street IECC was Shenfield in 1992, which had only opened 10 years earlier. The last boxes to be transferred were at Romford and Gidea Park in 1998; these were the oldest of those being transferred, having been opened under the GER/LNER 1924 resignalling scheme.

The construction of Template:Rws (Chelmsford's second station) started in 2023 and opened in October 2025. It was the first station on the railway line for over 100 years.[16][17]

Accidents and incidents

A number of fatal accidents have occurred on the line throughout its history:

Infrastructure

The line is owned and maintained by Network Rail.[2] It is part of Network Rail Strategic Route 7, which is composed of SRSs 07.01, 07.02 and 07.03, and is classified as a primary line. The GEML has a loading gauge of W10 between Liverpool Street and Haughley Junction (approximately Template:Convert north of Ipswich) and from there is W9 to Norwich. The maximum line speed is Template:Convert.[26]

Between Romford and Template:Rws, there is a Network Rail maintenance depot adjacent to the Jutsums Lane overbridge. In addition, at the London-end of the depot, is Network Rail's Electrical Control Room that controls the supply and switching of the overhead line system for the whole of the former Anglia Region.

Signalling is controlled by two main signalling centres: Liverpool Street IECC (opened in 1992) and Colchester PSB (opened in December 1983). Liverpool Street IECC controls signalling up to Template:Rws, where it fringes with Colchester PSB, which has control to Norwich. There are also several small signal boxes that control local infrastructure, such as Ingatestone box, which has jurisdiction over several local level crossings.

Line-side train monitoring equipment includes hot axle box detectors (HABD) on the down main and down electric lines near BrentwoodTemplate:Efn and on the up main near Margaretting (Template:Convert). Other equipment includes wheel impact load detectors (WILD) ‘Wheelchex’ on the down main and up main west of Church Lane level crossing (Template:Convert).[27][28]

Track layout

On leaving Liverpool Street, the route comprises two pairs of tracks, known as the mains and the electrics, with a further pair of tracks, the suburbans, which carry the West Anglia Main Line alongside the GEML to Template:Rws.

From Bethnal Green, the GEML has four lines to Bow junction, where there is a complex set of switches and crossings. A line from the LTS (Fenchurch Street) route joins the up (London-bound) electric and there are a further two lines, the up and down Temple Mills, giving access to the North London Line and Temple Mills. The GEML has six tracks up to the London-end of Stratford and the junction to Temple Mills; there are five lines through the station, dropping to four at the country end.

At Shenfield, the line to Southend Victoria diverges and the main line route drops from four tracks to two; this arrangement continues for the vast majority of the way to Norwich. There are several locations where the route has more than two tracks, predominantly through stations such as Colchester and Ipswich, along with goods loops, such as at the London end of Template:Rws. There is also a short stretch of single track on approach to Norwich, as the line passes over the river Wensum on the Trowse Bridge.

Tunnel and viaducts

Major civil engineering structures on the Great Eastern Main Line include the following:[27]

Tunnel and viaducts on the Great Eastern Main Line
Railway atructure Length Distance from Liverpool Street Location
Trowse Swing Bridge (River Wensum) Template:Convert (via Cambridge) Norwich
Lakenham Viaduct (including River Yare) Template:Convert Template:Convert – Template:Convert (via Ipswich) Between Norwich and Diss stations
Thraston Viaduct (River Tas) Template:Convert (via Ipswich)
River Waveney Viaduct Template:Convert (via Ipswich) South of Diss station
Badley Viaduct (River Gipping) Template:Convert Template:Convert – Template:Convert (via Ipswich) Between Stowmarket and Needham Market stations
Ipswich or Stoke Tunnel Template:Convert Template:Convert – Template:Convert South of Ipswich station
Cattawade Viaduct Template:Convert Template:Convert – Template:Convert East of Manningtree station
River Stour Viaduct Template:Convert Template:Convert – Template:Convert
Lexden Viaduct (River Colne) Template:Convert Template:Convert – Template:Convert West of Colchester (North) station
River Ter Viaduct Template:Convert Between Hatfield Peverel and Chelmsford stations
Boreham Viaduct Template:Convert Template:Convert – Template:Convert
River Chelmer Viaduct Template:Convert East of Chelmsford station
Chelmsford Viaduct Template:Convert Template:Convert – Template:Convert West of Chelmsford station
River Can Viaduct Template:Convert Template:Convert – Template:Convert
Ilford or Aldersbrook Flyover Template:Convert West of Ilford station
Bethnal Green Viaduct Template:Convert Template:Convert – Template:Convert Bethnal Green

Stoke tunnel

The only tunnel on the line is immediately south of Template:Rws station. The Template:Convert long tunnel was built by Peter Bruff as part of the Ipswich & Bury Railway. It was completed in 1846 and it is thought to be the earliest driven on a sharp continuous curve.[29] During the excavation of the tunnel, many important fossils were discovered, including rhinoceros, lion and mammoth; the site was known as the "Stoke Bone Beds".[30] The finds are considered important in understanding climate change during the Ice Age.[31] This tunnel had the trackbed lowered so the line could accommodate taller freight trains.

Electrification

The main line is electrified at Template:Nowrap using overhead wires under the control of Romford Electrical Control Room. The branches to Template:Stnlink, Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws and Template:Rws are also electrified. The history of electrification on the GEML and adjoining routes is unusually complicated with parts of the line having been electrified with three different systems. Due to this, as well as traffic demands growing throughout the 21st century, the traction supply feeding arrangements are complex and somewhat unintuitive with several seemingly redundant features.

The earliest stretch of electrification was between Liverpool Street (only platforms 11–18) to Shenfield along with the branch from Fenchurch Street (platforms 1 and 2) down the Bow Curve in 1949. This was an overhead line system (OLE) at [[Railway electrification#Overhead lines|1.5Template:NbspkVTemplate:NbspDC]] and was extended to Chelmsford and Southend Victoria in 1956.[32] Over the weekend of 5 and 6 November 1960, the system was converted to [[Railway electrification in Great Britain#6,250 V 50 Hz AC, overhead|6.25Template:NbspkVTemplate:NbspAC]] at mains frequency (50 Hz) between Liverpool Street and Southend Victoria,[33] with the wires from Shenfield to Chelmsford taken out of use to be converted to 25Template:NbspkVTemplate:NbspAC until re-energisation on 20 March 1961.[34](although passenger service with electric trains did not return until the next year). The low voltage AC utilised broadly the same substations, grid connections, OLE components and electrical clearances as the previous DC system.[35] At around the same time, the rest of the platforms and lines out of Liverpool Street (the Lea Valley lines) and out of Fenchurch Street were electrified also at 6.25Template:NbspkVTemplate:NbspAC in November 1960 and November 1961 respectively.

After this point, electrification was extended up the Great Eastern Main Line and on several branches all at 25Template:NbspkVTemplate:NbspAC. The line from Colchester to Clacton-on-Sea and Walton-on-the-Naze was previously electrified in 1959 and the gap was filled between Colchester and Chelmsford on 18 June 1962.[36] From 1975 until 1988, all the sections of 6.25Template:NbspkVTemplate:NbspAC around London and Southend across all lines in the Anglia region were converted to 25Template:NbspkVTemplate:NbspAC requiring new substations and significant modifications to the OLE components. In 2022, a small section between Bow Junction and Gidea Park was upgraded to a two AC autotransformer system in order to support the Elizabeth line service. The full timeline for the electrification on the GEML and branches is summarised below.

Timeline of GEML electrification[34]
Date Route Action Voltage OLE System
26 September 1949 London Liverpool Street (plat. 11–18) to Shenfield

London Fenchurch Street (plat. 1–2) to Bow JunctionTemplate:Efn

new build [[Railway electrification#Overhead lines|1.5Template:NbspkVTemplate:NbspDC]] GE/MSW
11 June 1956 Shenfield to Chelmsford new build 1.5Template:NbspkVTemplate:NbspDC SCS
31 December 1956 Shenfield to Southend Victoria new build 1.5Template:NbspkVTemplate:NbspDC SCS
16 March 1959 Colchester to Clacton-on-Sea/Walton-on-the-NazeTemplate:Efn new build [[25 kV AC railway electrification|25Template:NbspkVTemplate:NbspAC 50 Hz]] Mark 1
4 November 1960 Shenfield to Chelmsford

London Fenchurch Street to Bow JunctionTemplate:Efn

de-energisation (earthed) —
6 November 1960 London Liverpool Street to Southend Victoria conversion [[Railway electrification in Great Britain#6,250 V 50 Hz AC, overhead|6.25Template:NbspkVTemplate:NbspAC 50 Hz]] —
21 November 1960 London Liverpool Street (plat. 1–10) to Chingford/Enfield Town/Cheshunt via Seven SistersTemplate:Efn new build 6.25Template:NbspkVTemplate:NbspAC 50 Hz Mark 1
6 November 1961 Fenchurch Street (all platforms) to Barking/Bow Junction

Forest Gate Junction to BarkingTemplate:Efn

new build/

re-energisation

6.25Template:NbspkVTemplate:NbspAC 50 Hz Mark 1 (on new parts)
20 March 1961 Shenfield to ChelmsfordTemplate:Efn re-energisation 25Template:NbspkVTemplate:NbspAC 50 Hz —
18 June 1962 Chelmsford to Colchester new build 25Template:NbspkVTemplate:NbspAC 50 Hz Mark 1
1 January 1976 Gidea Park to Shenfield conversion 25Template:NbspkVTemplate:NbspAC 50 Hz —
31 October 1977 Witham to Braintree new build 25Template:NbspkVTemplate:NbspAC 50 Hz Mark 3a
2 March 1980 Manor Park to Gidea ParkTemplate:Efn conversion 25Template:NbspkVTemplate:NbspAC 50 Hz —
14 September 1980 Bow Junction to Manor ParkTemplate:Efn
12 October 1980 London Liverpool Street to Bow Junction

London Liverpool Street to Hackney DownsTemplate:Efn

Shenfield to Southend VictoriaTemplate:Efn

13 May 1985 Colchester to Ipswich new build 25Template:NbspkVTemplate:NbspAC 50 Hz Mark 3b
22 July 1985 Ipswich to Stowmarket
12 May 1986 Wickford to Southminster
Manningtree to Harwich
Romford to Upminster
11 May 1987 Stowmarket to Norwich
~1988 London Fenchurch Street to Barking/Bow Junction

Forest Gate Junction to Barking

Leigh-on-Sea to Shoeburyness

conversion 25Template:NbspkVTemplate:NbspAC 50 Hz —
~2022 London Liverpool Street to Chelmsford

Shenfield to Southend Victoria

re-equipping of OLE systemTemplate:Efn — GEFF
24 June 2022[37] Bow Junction to Gidea Park conversion to AT feeding 2x 25Template:NbspkVTemplate:NbspAC

(Autotransformer system)

—

Historic 6.25 kV / 25 kV voltage changeover

Since trains would through-run between 6.25Template:NbspkV and 25Template:NbspkV sections in regular operation, all EMUs built for the Anglia region between 1960 and 1980 were fitted for dual AC voltage with equipment to automatically switch between the two power systems while running.[38] The main transformer on the train had four identical primary windings which could be connected in series for 25Template:NbspkV working, or in parallel for 6.25Template:NbspkV working, by means of a "supply changeover switch". It was vital that the changeover switch was in the correct position since, if the voltage was too low, the train could not operate, while if the voltage was too high, serious damage could occur. For this reason, the switchover had to be made automatically by way of voltage sensing equipment rather than rely on the driver operating controls.

At the points where the two systems met – such as on the main line just east of Shenfield – there was a short length of overhead line which was electrically neutral. Neutral sections were installed either at breaks between supply areas or where the two voltages met. Whether or not the voltage was different on the other side of the neutral section, the on-train equipment operated in exactly the same way. At each end of the neutral section there were track-mounted permeant magnets referred to as Automatic Power Control (APC) magnets.[39]

On board the train, the operation of the dual-voltage mechanism depended on the action of the main air-blast circuit breaker and voltage-sensing relays. When passing the first APC magnet, detection equipment fitted to the bogies would activate the circuit breaker cutting all power to the train. Once the train had passed the neutral section, the second set of APC magnets are detected by the bogie-mounted inducers which causes a lock to be released on the circuit breaker meaning its reclosing would be under the control of the voltage-detection equipment. This consisted of four voltage relays that would allow for a line voltage between 4.1 and 6.9Template:NbspkV for the low-voltage mode, and 16.5 to 27.5Template:NbspkV for the high-voltage mode. If the first relay was tripped, the changeover switch at the transformer was set to the low-voltage mode and the circuit breaker closed. All four relays were activated if the voltage was above 16.5Template:NbspkV. In that case, the current was sent to a magnetic switch that would set the changeover switch at the transformer to the 25Template:NbspkV position.

The other relays were installed to stop the changeover switch from being activated to low-voltage mode if the line voltage fell under 16.5Template:NbspkV but greater than 6.9Template:NbspkV. The changeover system was interlocked with the circuit breaker and the action of the APC magnets since any movement of the changeover switch while the circuit breaker was closed and connecting the system to any live current would cause destructive arcing for the internal components. Following testing and some in service incidents, modifications were made to the changeover equipment such that a switch to the low-voltage mode could only be made when the line voltage had dropped to below 3Template:NbspkV and then risen to 4.1Template:NbspkV, and that the reclosing of the circuit breaker is only made after a two-second wait following the detection of the second APC magnet to ensure a correct reading of the voltage.[40][41]

As well as new EMUs introduced after 1960, the previous class 306 and 307 units originally built for the 1.5Template:NbspkVTemplate:NbspDC system underwent conversion to become 6.25/25Template:NbspkV dual-mode EMUs. The conversion of both these classes of train involved significant interventions particularly the relocating of the pantograph to a different carriage and the associated internal layout changes this caused.[38] The full 92-unit fleet of class 306s and the 32 units of class 307 fleet underwent alterations at Stratford Works with new equipment provided by Associated Electrical Industries at Manchester.[41]

Neutral sections are, or course, still required on the modern 25Template:NbspkV system and APC magnets are still used to automatically trigger the opening of the train's circuit breaker so that an arc is not caused at OLE when the pantograph travels between live and earthed wire.[39]

Feeding arrangements

The majority of the GEML network is electrified using the 'classic' feeding arrangement connected to the 132Template:NbspkV distribution grid all controlled by UK Power Networks. In accordance with the Crossrail project, autotransformer feeding was fitted between the new autotransformer feeder station (ATFS) at Pudding Mill Lane and Gidea Park. Pudding Mill Lane ATFS also feeds the Crossrail core from that point to the Westbourne Park tunnel portal and towards Abbey Wood.[42] This entirely replaced Crowlands classic feeder station (located between Chadwell Heath and Romford) and significantly reduced the load of the Bow Junction classic feeder station. The feeder station is connected to the National Grid 400Template:NbspkV transmission substation also named Pudding Mill Lane.

The line between Gidea Park and Shenfield is fitted out to be converted to autotransformer feeding in the near future with a sectioning autotransformer station (SATS) already completed at Shenfield in 2018.[43] Autotransformer feeding is also due to be extended as far as Beaulieu Park, as a new ATFS is being constructed just north of the station at the same site as the Springfield classic feeder station.[44]

The original 1.5Template:NbspkVTemplate:NbspDC system of 1949 used mercury arc powered traction substations at Bethnal Green (6Template:NbspMW), Stratford (8Template:NbspMW), Chadwell Heath (6Template:NbspMW), Gidea Park (4Template:NbspMW), and Shenfield (4Template:NbspMW) all supplied by 33Template:NbspkV three-phase AC distribution ring owned and operated by the railway. The 33Template:NbspkV ring was itself supplied by the utility grid at Brentwood, Chadwell Heath (from Barking Power Station) and Crosswall (near Fenchurch Street) at 22Template:NbspkV where it was stepped up to 33Template:NbspkV.[45] The line from Gas Factory Jcn was also electrified to Fenchurch Street and supplied by Crosswall substation (2Template:NbspMW). The entire high voltage distribution system and the traction feeding system were controlled from Chadwell Heath in what was the biggest traction application in the UK.[46] Beyond Shenfield, the DC system installed in 1956 to Chelmsford and Southend Victoria did not use the railway distribution lines but were connected directly to the public utility grid at 33Template:NbspkV.[47]

Between Liverpool Street and Shenfield, the DC substations were significantly altered but retained for the conversion to 6.25Template:NbspkV in 1960 but were unsuitable for the further upgrades to 25Template:NbspkV. So too were the 33Template:NbspkV distribution lines which were reinforced by replacing the Crosswall grid connection with a stronger one at Bethnal Green. However, after 1960, the distribution lines no longer powered Shenfield substation as a new feeder station was built that could supply both 6.25Template:NbspkV southwards and on the Southend line and 25Template:NbspkV for the line north to Chelmsford and for the future upgrade.[35]

From 1976 to 1980, the 6.25Template:NbspkV lines between Liverpool Street and Southend Victoria were upgraded to 25Template:NbspkV which required entirely new grid connections and substations. New feeder stations were installed at Crowlands and at Bow Junction. The substation at Gidea Park became the MPTSC between Shenfield and Crowlands, and a brand new MPTSC was installed at Manor Park to separate Crowlands and Bow Junction feeder stations. Bow Junction feeder station also supplied the WAML up to a new MPTSC at Hackney Downs by way of a new Spitalfields TSC around Bethnal Green junction.[48]

List of traction substations on the Great Eastern Main Line[45][47][48][49][50][51][52]
MileageTemplate:Efn Substation Type In use Neutral section Grid Connection Notes
(London Liverpool Street station: datum point for the line)
Template:Convert Liverpool Street TSCTemplate:Efn 1949–1980 no n/a Converted in 1960 from 1.5Template:NbspkVTemplate:NbspDC to 6.25Template:NbspkVTemplate:NbspAC
Template:Convert Spitalfields TSC since 1980 no n/a Allows Bow Junction "A" to feed the WAML that splits at Bethnal Green. Replaced Liverpool Street TSC
Template:Convert Bethnal Green FS 1949–1980 yes (from 1960) Railway owned 33Template:NbspkV ring Converted in 1960 from 1.5Template:NbspkVTemplate:NbspDC to 6.25Template:NbspkVTemplate:NbspAC. Substation also fed WAML from 1960.
Template:Convert Bow Junction TSC 1949–1980 no n/a Converted in 1960 from 1.5Template:NbspkVTemplate:NbspDC to 6.25Template:NbspkVTemplate:NbspAC
Template:Convert Bow Junction FS since 1980 yesTemplate:Efn UKPN 132Template:NbspkV underground power line

(Hackney Supergrid 132 to Bow 132)[53]

Dual FS with "A" and "B" sides. Installed for 25Template:NbspkV upgrade. Replaced Bethnal Green and Stratford FSs. Since 2022, the "B" side no longer feeds GEML but does supply North London Line and Temple Mills Branch via ducting to the Stratford area.
Template:Convert Pudding Mill Lane ATFS since 2022 yes Adjacent National Grid Pudding Mill Lane 400Template:NbspkV transmission substation Dual ATFS. "A" side powers Crossrail Central Operating Section, "B" side powers GEML replacing Bow Junction "B" FS.
Template:Convert Stratford FS 1949–1980 yes (from 1960) Railway owned 33Template:NbspkV ring Converted in 1960 from 1.5Template:NbspkVTemplate:NbspDC to 6.25Template:NbspkVTemplate:NbspAC
Template:Convert Manor Park SATS since 1980 yes n/a Installed for 25Template:NbspkV upgrade. Acted as an MPTSC between Bow Junction "B" FS and Crowlands "A" FS until Pudding Mill Lane ATFS replaced both in 2022. Neutral section still in situ so this substation may still be in use in some.
Template:Convert Ilford SATS since 1949 no n/a Installed originally as a TSC from 1949, converted to 6.25Template:NbspkV in 1960, to 25Template:NbspkV in 1980, and finally converted to a SATS by 2022.
Template:Convert Chadwell Heath FS 1949–1980 yes (from 1960) Railway owned 33Template:NbspkV ring Converted in 1960 from 1.5Template:NbspkVTemplate:NbspDC to 6.25Template:NbspkVTemplate:NbspAC. Chadwell Heath was the location of the main grid connection for the railway's 33Template:NbspkV ring.
Template:Convert Crowlands SATS since 1980 yes (1980–2022) UKPN 132Template:NbspkV underground power line

(Barking 132Template:NbspkV to Crowlands Grid)[54]

Originally Dual FS with "A" and "B" sides. Installed for 25Template:NbspkV upgrade. Replaced Chadwell Heath FS and Gidea Park as an FS. The substation may have become a SATS from 2022 since the neutral section is still in situ.
Template:Convert Gidea Park MPATS/MPTSC since 1949 yes (from 1960) (1949–1980) Railway owned 33Template:NbspkV ring

(since 1980) n/a

Installed originally as an FS from 1949, converted to 6.25Template:NbspkV in 1960. Converted into a MPTSC between Crowlands "B" and Shenfield "A" in 1980 and finally converted to a MPATS by 2022.
Template:Convert Brook Street MPTSC 1949–1976 yes (from 1960) n/a Originally as 1.5Template:NbspkV TSC, converted to 6.25Template:NbspkV MPTSC in 1960, substation removed in 1976.
Template:Convert Shenfield [DC] FS (DC) 1949–1960 no Railway-owned 33Template:NbspkV ring Only ever a 1.5Template:NbspkVTemplate:NbspDC feeder station. Replaced by the new Shenfield FS with 132Template:NbspkV grid connection.
Template:Convert Shenfield [new] FS since 1960 yes UKPN 132Template:NbspkV underground power line

(Warley 132Template:NbspkV Grid to Shenfield Grid)[54]

Dual FS, originally capable of 6.25Template:NbspkV and 25Template:NbspkV operation until 1980 when it fed all lines at 25Template:NbspkV.

Since Springfield FS was introduced, normally only of two supplies is in use for the section Gidea Park to Shenfield. Substation is configured to feed the Southend line if needed. The site has been added to with a SATS since 2022 that is not yet in use.

Template:Convert Ingatestone TSC 1956–1960 no n/a 1.5Template:NbspkVTemplate:NbspDC TSC, removed when line was de-energised in 1960 for conversion to 25Template:NbspkVTemplate:NbspAC by 1961
Template:Convert Hylands FS (DC) 1956–1960 no unknown 1.5Template:NbspkVTemplate:NbspDC FS, removed when line was de-energised in 1960 for conversion to 25Template:NbspkVTemplate:NbspAC by 1961
Template:Convert Chelmsford TSC since 1961 no n/a Installed 1961 for the 25Template:NbspkV system
Template:Convert Springfield FS since 1993 yes UKPN 132Template:NbspkV overhead powerline

(Rayleigh Main 132Template:NbspkV to Braintree 132Template:NbspkV)[55]

Dual FS installed ~30 years after this section was originally electrified.

Due to soon become an ATFS

Template:Convert Witham TSC/MPTSC since 1962 yes n/a Originally installed as an MPTSC between Shenfield and Colchester FSs. Since Springfield FS was introduced, Witham is probably switched through in normal operation.
Template:Convert Hill House MPTSC (?) since 1962 yes (since 2011) Originally installed as a TSC on the Colchester supply in 1962. A neutral section was added in 2011 likely to separate the Springfield "B" and (new) Hythe "A" supplies. Unknown if any switching ability exists at this substation.
Template:Convert Colchester MPTSC since 1959 yes 1959–1993: yes (unknown)

1993–present: no

Originally installed as a dual FS. B side supplying the Clacton line (from 1959) and A side feeding the mainline to Witham in 1962. Colchester likely ceased being an FS in 1993 when Springfield FS on the mainline and Hythe FS (by 1989) on the Clacton line were installed.

Currently it is a three way MPTSC distributing the incoming Hythe FS "A" supply to the mainline south to Hill House as well as terminating the supply from Manningtree FS to the north.

Template:Convert Manningtree FS since 1985 yes UKPN 132Template:NbspkV overhead powerline (Cliff Quay grid to Lawford Grid)[56] The first single supply (tee feeding) FS on GEML only feeding southwards to Colchester. The substation also supplies the entirety of the Harwich line.
Template:Convert Ipswich TSC no n/a
Template:Convert Stowmarket FS since 1986 yes UKPN 132Template:NbspkV overhead powerline

(Bramford Grid to Bury [st Edmunds] Grid)[57]

Dual supply FS
Template:Convert Cow Green TSC since 1987 no n/a
Template:Convert Mellis TSC no
Template:Convert Hales Street MPTSC yes
Template:Convert Flordon TSC no
Template:Convert Norwich FS no UKPN 25Template:NbspkV underground powerline to nereby Thorpe 132Template:NbspkV Grid Single supply FS
Template:Convert [Norwich Station, end of line]

Rolling stock

Inter-city

Steam-hauled inter-city trains on the London-Norwich service were replaced by diesel power in the 1960s; locomotives from classes 40, 37 and 47 hauled services until the mid-1980s.

Electric locomotives replaced diesel haulage from the mid-1980s, when the remainder of the GEML was electrified north of Colchester; their utilisation continued until March 2020. Template:Brc locomotives powered the service from 1985 until 2005,Template:Efn with rakes of Mark 2 coaches. Push-pull services were introduced during their tenure, initially using a DBSO coach at the Norwich end and latterly with Mark 3 Driving Van Trailers, cascaded from the West Coast Main Line. From 2004, Template:Brc locomotives replaced the ageing Class 86s and rolling stock was updated with refurbished former West Coast Main Line Mark 3 coaches, following the introduction of the Class 390 Pendolino stock on that route.

By March 2020, new Template:Brc EMUs had fully replaced Class 90 and Mark 3 coaches; thereby ending locomotive operation on the inter-city services on the Great Eastern Main Line.[58][59]

Suburban

Electric multiple units are used for inner and outer suburban passenger trains and diesel multiple units are used on non-electrified branch lines.[2] The main passenger units utilised are:

On weekends and when engineering work occurs, c2c run services into Liverpool Street via Stratford using Template:Brc EMUs.

Developments

Crossrail

{{ safesubst:#invoke:Unsubst||date=__DATE__ |$B= {{ safesubst:#invoke:Unsubst||date=__DATE__ |$B= Template:Ambox }}Template:Ifsubst }} In 2015, TfL Rail, the precursor of the Elizabeth line, took over operation of the Shenfield stopping "metro" service and, since 2022, the service runs via a tunnel through central London and links up with the Great Western Main Line to Template:Stnlnk and Heathrow Airport.

The first new Template:Brc rolling stock entered service on the service on 22 June 2017. The new trains, built at Bombardier's Derby factory, provide air conditioned walk-through carriages, intelligent lighting and temperature control, closed-circuit television and passenger information displays showing travel information, including about onward journeys. It was planned that by September 2017, half of the services between Shenfield and Liverpool Street will have switched to the new Class 345 trains. From May 2015, TfL Rail services (rebranded in 2022 as the Elizabeth line) have an interchange with existing GEML services at Liverpool Street (via new underground platforms) as well as Stratford, Romford and Shenfield.

In November 2022, Elizabeth line services began to operate between Shenfield and London Paddington via Farringdon. However no services operate further than Paddington onto the likes of Heathrow Airport and Reading; instead, these services start from Template:Rws, the Elizabeth line's south-east branch.

Proposed developments

A new station is planned at Great Blakenham as part of the SnOasis development approximately halfway between Template:Rws and Template:Rws,[60][61]

Services

The majority of trains are operated by Greater Anglia, with the Elizabeth line operating the stopping services between Liverpool Street to Shenfield. A limited number of weekend (and when engineering work is planned) c2c services, operate on part of the line between Stratford and Liverpool Street.[2]

Main line

{{ safesubst:#invoke:Unsubst||date=__DATE__ |$B= {{ safesubst:#invoke:Unsubst||date=__DATE__ |$B= Template:Ambox }}Template:Ifsubst }} Fast and semi-fast services utilise the main line between Liverpool Street and Shenfield. Branch lines diverge at Romford, Shenfield, Witham, Marks Tey, Colchester, Ipswich, Stowmarket and Norwich.

Additionally, a very limited number of main line services call at Ilford, Seven Kings and Gidea Park during early mornings and late nights, often for the convenience of train drivers who may be working from these locations.

Station Borough Branch lines
London Liverpool Street City of London
Stratford Newham
Romford Havering Romford–Upminster line
Shenfield Brentwood Shenfield–Southend line
Ingatestone Brentwood
Chelmsford Chelmsford
Hatfield Peverel Braintree
Witham Braintree Braintree branch line
Kelvedon Braintree
Marks Tey Colchester Gainsborough line
Colchester Colchester Sunshine Coast line
Manningtree Tendring Mayflower line
Ipswich Ipswich East Suffolk line; Felixstowe branch line
Needham MarketTemplate:Efn Mid Suffolk
Stowmarket Mid Suffolk Ipswich–Ely line
Diss South Norfolk
Norwich Norwich Wherry lines; Bittern line; Breckland line

Elizabeth line

Elizabeth line services operate from Heathrow Terminal 5 or Template:Rws to Template:Rws, via London Liverpool Street. Off-peak, there are eight trains per hour.[62]

Station Fare zone Borough
London Liverpool Street 1 City of London
Stratford 2/3 Newham
Maryland 3 Newham
Forest Gate 3 Newham
Manor Park 3/4 Newham
Ilford 4 Redbridge
Seven Kings 4 Redbridge
Goodmayes 4 Redbridge
Chadwell Heath 5 Redbridge
Romford 6 Havering
Gidea Park 6 Havering
Harold Wood 6 Havering
Brentwood 9 Brentwood
Shenfield C Brentwood

Passenger volume

These are the passenger usage statistics from the year beginning April 2002 to April 2013, and for those beginning April 2016 to April 2022:

Template:GBsta-u

Notes

Template:Notelist

References

Template:Reflist

Further reading

Template:Sister project Template:Attached KML

Template:Main inter-regional railway lines in Great Britain Template:Railway lines in the East of England Template:Railway lines in London Template:Crossrail navbox

  1. ↑ National Rail, Rail Services Around London & the South East, (2006)
  2. ↑ 2.0 2.1 2.2 2.3 Network Rail Template:Webarchive - Route 7 - Great Eastern (PDF)
  3. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  4. ↑ Template:Cite book
  5. ↑ Template:Cite book
  6. ↑ Template:Cite book
  7. ↑ Template:Cite journal
  8. ↑ Template:Cite journal
  9. ↑ Template:Cite journal
  10. ↑ Template:Cite book
  11. ↑ Template:Cite journal
  12. ↑ Template:Cite journal
  13. ↑ Glover, John (2003). "Eastern Electric", Ian Allan, London. Template:ISBN.
  14. ↑ Template:Cite book
  15. ↑ Template:Cite book
  16. ↑ Template:Cite news
  17. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  18. ↑ Allen, Cecil J.; 'The Great Eastern Railway' 1955
  19. ↑ Template:Cite report
  20. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  21. ↑ Template:Cite book
  22. ↑ Template:Cite book
  23. ↑ Template:Cite book
  24. ↑ Template:Cite report
  25. ↑ Template:Cite report
  26. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  27. ↑ 27.0 27.1 Template:Cite book
  28. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  29. ↑ Template:Cite book
  30. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  31. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  32. ↑ Template:Cite book
  33. ↑ Template:Cite book
  34. ↑ 34.0 34.1 Template:Cite book
  35. ↑ 35.0 35.1 Template:Cite journal
  36. ↑ Template:Cite book
  37. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  38. ↑ 38.0 38.1 Template:Cite book
  39. ↑ 39.0 39.1 Template:Cite book
  40. ↑ Template:Cite book
  41. ↑ 41.0 41.1 Template:Cite report
  42. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  43. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  44. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  45. ↑ 45.0 45.1 Template:Cite book
  46. ↑ Template:Cite book
  47. ↑ 47.0 47.1 Template:Cite journal
  48. ↑ 48.0 48.1 {{#invoke:citation/CS1|citation |CitationClass=web }}
  49. ↑ Template:Cite book
  50. ↑ Template:Cite book
  51. ↑ Template:Cite book
  52. ↑ Template:Cite journal
  53. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  54. ↑ 54.0 54.1 {{#invoke:citation/CS1|citation |CitationClass=web }}
  55. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  56. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  57. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  58. ↑ Abellio wins East Anglian rail franchise for nine years in £1.4bn deal Template:Webarchive East Anglian Daily Times 10 August 2016
  59. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  60. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  61. ↑ Template:Cite news
  62. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}