The Massachusetts Bay Transportation Authority (MBTA) operates [[List of MBTA bus routes|Template:MBTA bus links/total bus routes]] in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance – defined as Template:Convert – for all residents living in areas with population densities greater than Template:Convert within the MBTA's service district. Much of this service is provided by bus. In Template:American transit ridership, the system had a ridership of Template:American transit ridership, or about Template:American transit ridership per weekday as of Template:American transit ridership.

Most MBTA bus routes are local service operated in Boston and its inner suburbs and connect to MBTA subway stations. Fifteen high-ridership local routes are designated as key routes, with higher frequency at all operating hours. The MBTA operates a five-route bus rapid transit service branded as the Silver Line, as well as a limited-stop crosstown route. Three smaller local networks are based in the nearby cities of Lynn, Waltham, and Quincy. Several express routes operate from suburbs to downtown Boston.

The MBTA has an active bus fleet around 1,040 buses with diesel-electric hybrid or compressed natural gas propulsion. Replacement of the full fleet with battery electric buses is planned. The entire bus system is accessible; all vehicles are low-floor buses with fold-out ramps.

Most routes are operated directly by the MBTA. Four suburban routes are run by private operators under contract to the MBTA, while several small circulator systems are run by other operators with partial MBTA subsidy. MBTA-operated buses operate from nine divisions based at eight garages. One additional garage is under reconstruction; a replacement for a second is under construction, and additional replacements are planned. Several sections of dedicated right-of-way for MBTA buses have been opened in the 21st century, including two off-street busways for the Silver Line and a number of dedicated bus lanes.

The modern bus system descends from a network of horsecar and electric streetcar lines built in the 1850s to 1910s, which were consolidated under the West End Street Railway and later Boston Elevated Railway (BERy). The BERy introduced buses in 1922 to replace lightly-used streetcar lines and expand into new areas. Over the next four decades under the BERy and Metropolitan Transit Authority (MTA), all but six streetcar routes were converted to bus or trolleybus. Most trolleybuses were phased out by the 1960s, but four routes lasted until 2022. The MBTA took over the MTA in 1964, and several private suburban bus operators over the following two decades. Many routes have been modified during the MBTA era; the agency introduced crosstown routes in 1994 and the Silver Line in 2002.

History

File:MBTA Arborway Yard in 1967.jpg
Buses at Arborway Yard in 1967

A number of horsecar lines were built in Boston and surrounding towns in the second half of the 19th century, beginning with the Cambridge Railroad in 1856. Several smaller companies were consolidated into the West End Street Railway in 1887. The West End began electrifying existing lines and constructing new streetcar lines; the last horsecar lines ended in 1900. The West End was purchased in 1897 by the Boston Elevated Railway (BERy), which had been created to build a rapid transit system in Boston. As that system was constructed in the first two decades of the 20th century, many streetcar lines were cut back from downtown Boston to rapid transit stations. Stations like Template:Bts, Template:Bts, Template:Bts, Template:Bts, and Template:Bts were built as transfer stations with easy connections between subway and rapid transit.

Some small companies operated buses in Boston as early as the 1910s. BERy bus service began on February 23, 1922, when buses replaced the North Beacon Street streetcar line.[1] Initial bus routes largely replaced lightly-used streetcar lines or expanded service to new areas. The BERy also attempted in the 1920s to make the Tremont Street streetcar subway operate more like a rapid transit line, using trains of streetcars entering the subway from a small number of feeder lines, rather than single streetcars from numerous surface lines.[2] The Harvard–Lechmere streetcar line was converted to trackless trolley (trolleybus) on April 11, 1936 – the first route in what would become an extensive trackless trolley system.[3]

As increased automobile usage reduced ridership and increased congestion, the BERy and its 1947 replacement Metropolitan Transit Authority (MTA) continued to convert streetcar lines to bus and trolleybus. Most trolleybus lines were replaced by buses in the late 1940s to early 1960s, as buses offered increased flexibility and no need to maintain overhead lines. When the Massachusetts Bay Transportation Authority (MBTA) replaced the MTA in 1964, all surface lines were operated by buses except six streetcar lines (the five Green Line branches plus the Mattapan Line) and four trolleybus lines.[4] The MBTA rebranded many elements of Boston's public transportation network in its first decade. After being found unsuitable in 1965 for the Orange Line because it did not show up well on maps, yellow was chosen for the color of bus operations on January 8, 1972.[5][6]

The MBTA had primarily been formed to subsidize the suburban commuter rail network. However, the agency also took over unprofitable suburban bus operations – much of which was former streetcar lines – from several private companies. The MBTA took over the Eastern Massachusetts Street Railway in 1968, inheriting large networks based in Lynn and Quincy plus several lines in Norwood and Melrose. (Networks serving Lowell, Lawrence, and Brockton outside the MBTA district were briefly operated by the MBTA. They were transferred to new public agencies: the LRTA in Lowell in 1976, a predecessor of the MVRTA in Lawrence in 1968, and a predecessor of the BAT in Brockton in 1969.) The MBTA began subsidizing Middlesex and Boston Street Railway service based in Newton and Waltham in 1964, and took over the remaining routes in 1972. Five former Service Bus Lines routes in northeast suburbs were taken over in 1975, and a single Brush Hill Transportation line in Milton was taken over in 1980.[4]

The geographic scope of the MBTA bus network has remained relatively constant since these additions, though many services have been created, discontinued, and modified during the MBTA era. The openings of new sections of the Red Line (1971, 1980, 1984–85) and the Orange Line (1975–77, 1987) have resulted in significant changes as routes were modified to serve new transfer stations.[4] Three limited-stop crosstown routes were created in 1994 as a prelude to the Urban Ring Project, a never-implemented circumferential bus rapid transit (BRT) corridor. Silver Line BRT service began in 2002 with conversion of existing bus service on Washington Street, and was expanded in 2004–05 with new routes serving the Waterfront Tunnel in the Seaport District. The latter used dual-mode buses that operated as trolleybuses in the Waterfront Tunnel and as diesel buses on the surface. A second Silver Line service using the Washington Street corridor was added in 2009, and service from the Waterfront Tunnel to Template:Bts began in 2018 with a new surface busway in Chelsea.[4]

The BERy and MTA operated overnight Owl service until 1960. From September 2001 to June 2005, the MBTA operated bus service on 17 routes (7 normal bus routes and 10 routes replicating subway lines) until 2:30am on Friday and Saturday nights. Similar service on the key routes was operated from March 2013 to March 2014.[4] In 2017, the MBTA Board rejected a proposal to run all-night service on several routes with pulsed connections at a central hub.[7]

In 2018, the MBTA began planning for the Bus Network Redesign, a reworking of the entire bus network.[8] A draft plan was released in May 2022, with a revised plan in November 2022.[9][10] That plan was approved in December 2022. It increases overall service by 25%, with a doubling of the number of routes with high-frequency service.[8] The first changes were made on December 15, 2024, in areas northeast of downtown Boston.[11] The second phase is planned to cover most of Boston and Brookline; the third and south phases are tentatively planned to cover northern and southern suburbs.[12] Changes will take place through 2028.[8][13] The second changes were made on April 5, 2026.[14]Template:Better source needed

In 2022, the MBTA started cutting bus service due to a driver shortage resulting from a long-term retirement trend accelerated by the COVID-19 pandemic in Massachusetts. Despite paying for training to get a commercial driver's license and offering a $4,500 signing bonus, it ended the year short about 350 drivers, plus about 400 more needed to increase service to implement a proposed bus network redesign. Experts said the shortage was caused by the failure to raise the starting hourly wage, and offer new hires full-time work instead of forcing all of them to start part-time. Drivers were also unhappy about lack of access to bathrooms and "split shifts" with unpaid time between morning and evening rush hour that was too short to go home.[15] The MBTA began hiring operators for full-time work in 2023.[16] The number of bus drivers increased from about 1,350 in mid-2023 to about 1,500 in March 2024.[12]

Template:Clear left

Fleet

This is the current bus roster for the MBTA Template:As of. All buses are manufactured by New Flyer and are Template:Convert wide; most buses are Template:Convert length, while 117 are Template:Convert articulated buses.[17] 80 New Flyer 40-foot battery-electric buses were ordered in July 2023. Thirty-two of those buses will have left-side doors for use in the Harvard bus tunnel.[18][19] 40 additional electric buses were ordered in December 2025 to provide service for the Quincy Bus Maintenance Facility to be opened in 2027; 15 of these buses will be funded with settlement money from Volkswagen from their 2015 "Dieselgate" emissions cheating scandal.[20][21] State law requires the MBTA to purchase only zero-emission buses after 2029 and mandates a fully-electrified fleet by 2040.[20]

Current

Year built Manufacturer Model Picture Fleet Qty. Active Propulsion Length (ft.) Notes
2008 New Flyer D40LF File:MBTA route 455 bus on Western Avenue, May 2017.JPG 0756–0910 155 153 Diesel 40
  • All buses were overhauled in 2017–2020.[17]
  • To be replaced by newer NFI XE40 buses.
2010 DE60LFR File:MBTA New Flyer DE60LFR 1223 at Copley Square.jpg 1200–1224 25 Hybrid 60
  • All buses were overhauled by Northeastern Bus Rebuilders in 2021–2023[17]
2014–2015 XDE40 File:Southbound MBTA 105 bus on Alford Street Bridge November 2025.jpg 1400–1459 60 40
2016–2017 XN40 File:MBTA route 8 bus on Massachusetts Avenue, March 2022.JPG 1600–1774 175 CNG
  • Buses being overhauled by MBTA at Everett Shops[17]
2016–2017 XDE40 File:MBTA 1845 at Dudley Square station, March 2017.jpg 1775–1924 &
3000–3005
156 Hybrid
2016–2017 XDE60 File:(USA-Massachusetts) Massachusetts Bay Transportation Authority 1283 MA-(T)1283 SL5 2024-06-08.jpg 1250–1293 44 60
  • 1273–1293 used for Silver Line Washington Street routes
2018 File:MBTA 1294 at World Trade Center station, September 2018.jpg 1294 1
2019 XE60 File:World Trade Center Outbound MBTA Silver Line Platform, July 2024.jpg 1295–1299 5 Battery-electric
2019–2020 XDE40 File:MBTA route 89 bus on Broadway, April 2023.JPG 1925–2118 194 Hybrid 40
2020 File:MBTA New Flyer XDE40 3125 at Lechmere station, March 2023.jpg 3100–3159 60
2022–2023 XDE60 File:MBTA New Flyer XDE60 1305 at Airport Station, August 2024.jpg 1300–1344 45 60
  • Includes an extended-range battery.
  • Used on the Silver Line.
2023 XDE40 File:MBTA 57 bus in Brighton Center August 2024.jpg 3200–3359 160 40
2024–2026 XE40 File:MBTA route 71 XE40 bus in Watertown May 2026 (cropped).jpg 4200–4231 32 Battery-electric
  • Equipped with left-hand doors for operating into the Harvard bus tunnel
  • Buses are to be operated out of North Cambridge Garage beginning in December 2026.[17][20][26]
2025 File:MBTA XE40 electric bus on route 71 at Watertown Square January 2026 2.jpg 4300–4304 5
  • Pilot buses will be assigned to Cabot and Charlestown.[17][27]
  • Will provide service out of the new Quincy Bus Maintenance Facility in 2027.[20][17]

Future

Expected delivery Manufacturer Model Picture Fleet Qty. Propulsion Length (ft.) Notes
2026–2027 New Flyer XE40 File:MBTA XE40 4305 at Northeast Bus Rebuilders Readville October 2026.jpg 4305–4387 83 Battery-electric 40
  • Contract that was exercised from the July 2024 option order.[17][20]
  • Will provide service out of the new Quincy Bus Maintenance Facility in 2027.[20][17]
  • Will replace most of the 2008 New Flyer diesel fleet.[17][20]
2028 XDE40 TBD 65 Hybrid
  • For delivery in 2028
  • To replace 2014-2015 New Flyer hybrids.[23][17]

Facilities

File:MBTA bus districts.svg
MBTA bus routes grouped by the facility they operated from at peak hours in 2016 Template:Legend-col

MBTA buses are operated out of nine divisions based at eight facilities (the two Charlestown garages share a site).[17]

Name Address Routes Times of Operation
Albany Street 421 Albany Street, Boston 1, 4, 7, 8, 9, 10, 11, 15, 17, 18, 19, 22, 23, 43, 44, 45, 47, 55, 57, 59, 60, 65, 66, 85, 171, 191, 193, 501, 504, 505, 553, 554, 556, 558, CT3 Weekday rush hours and middays
Cabot 275 Dorchester Avenue, South Boston All operating hours
Arborway 3600 Washington Street, Jamaica Plain 14, 16, 21, 29, 30, 31, 32, 34, 34E, 35, 36, 37, 38, 40, 41, 42, 50, 51, 52, 192 All operating hours
Charlestown (Bennett/Somerville District) 21 Arlington Avenue, Charlestown 61, 62, 64, 67, 68, 69, 70, 71, 73, 74, 75, 76, 77, 78, 80, 83, 86, 87, 88, 350, 351
Charlestown (Charlestown District) 89, 90, 91, 92, 93, 94, 95, 96, 97, 99, 100, 101, 104, 105, 106, 108, 109, 110, 111, 112, 131, 132, 134, 137, 194, 354, 411, 430
Fellsway 465 Salem Street, Medford Weekday rush hours and middays
Lynn 985 Western Avenue, Lynn 114, 116, 119, 120, 121, 424, 426, 428, 429, 435, 436, 439, 441, 442, 450, 451, 455, 456, 465 All operating hours
Quincy 954 Hancock Street, Quincy 24, 26, 33, 201, 202, 210, 211, 215, 216, 217, 220, 222, 225, 226, 230, 236, 238, 240, 245
Southampton 230 Southampton Street, Boston 16 (some weekday trips), 28, 39, Silver Line (SL1, SL2, SL3, SL4, SL5, SLW)

Replacements

The North Cambridge bus facility, which was used by trackless trolleys until March 2022, is to be modified for battery-electric buses. A $27.3 million contract was issued in October 2023, with completion expected in November 2025.[28] Template:As of, the garage modifications are complete.[29] Bus service from the garage is expected to start in summer 2026.[26]

Quincy Garage is being replaced with a larger facility near Quincy Adams station.[30] The parcel was purchased for $38.2 million in March 2021.[31] Early work, including demolition of an existing building at the site, was completed in mid-2022.[32] Bids in May 2022 came in higher than expected – $360 million versus $280 million – prompting the MBTA to switch to Construction Management at Risk bidding for the project.[33] Template:As of, the work is expected to cost $299 million, with substantial completion in March 2027.[32] Template:As of, the garage is expected to open in summer 2027.[26]

A replacement of Arborway Garage on-site is planned. Template:As of, the plans for the new garage will expand the fleet based there from 118 CNG buses to 200 battery-electric buses, including articulated buses for routes 28, 32, and 39.[34] The project was paused in 2025 due to a lack of funding, and would take 5-6 years to design and build once funded.[35][36] State funding for the garage was announced in October 2025 as part of an $850 million transfer from the Commonwealth Transportation Fund to the MBTA.[37] Template:As of, the project is planned to be fully funded in the FY 2027-2031 Capital Investment Plan (CIP). The new garage will support a fully battery-electric fleet, though it is planned to initially operate with a mix of battery-electric buses and hybrids.[27]

In July 2022, the MBTA indicated plans to purchase an adjacent parcel to expand Southampton Garage.[38] In August 2025, the MBTA purchased a site in Medford to replace Fellsway and Lynn garages.[39]

Private operators

File:Blue Hill Bus Lines 24 at Mattapan Terminal in 1967.jpg
A Blue Hill Bus Lines vehicle on the Canton–Mattapan route, now the #716 route, in 1967

Template:See also Most local bus routes in Massachusetts outside the immediate MBTA operating area are operated by the state's other regional transit authorities (RTAs). However, some routes that connect with MBTA bus or subway service are operated by outside private contractors with partial subsidy by the MBTA.[40]

Four routes – the Template:MBTABus, Template:MBTABus, Template:MBTABus, and Template:MBTABus – are numbered like other MBTA buses. The four routes are primarily commuter routes which connect with other MBTA services at their inbound terminals. They were taken over from various private operators (Rapid Transit Inc. for the 712/713, Nantasket Transportation for the 714, and Hudson Bus Lines for the 716).[4] The 712 and 713 use MBTA-provided buses; the other routes do not.

Two municipalities contract with outside operators for local circulator routes with partial MBTA subsidy. Lexington runs a three-route system, while a nonprofit shuttle is run in Boston's Mission Hill neighborhood.[4] Those routes appear on MBTA system maps and connect with MBTA services at designated transfer points, but are numbered separately and do not accept MBTA passes.

Bus lanes

A bus in an underground bus station
World Trade Center station in the South Boston Piers Transitway

Several sections of dedicated right-of-way for MBTA buses have been opened in the 21st century. Two sections of the Silver Line have off-street busways: The 2004-opened Template:Convert South Boston Piers Transitway tunnel in the Seaport (used by the Template:MBTABus, Template:MBTABus, Template:MBTABus, and Template:MBTABus), and a 2018-opened Template:Convert surface busway in Chelsea used by the SL3. A direct ramp to the Ted Williams Tunnel is proposed for use by the SL1 and SL3.

A bus on a red bus lane in an urban square
Route 87 bus at the Holland Avenue queue jump at Davis Square in 2020
File:MBTA 29 bus at Bray St.jpg
Route 29 bus on the Columbus Avenue bus lanes

A number of dedicated bus lanes on surface streets are also in use:

An additional Template:Convert of center lanes on Columbus Avenue and Tremont Street between Jackson Square and Template:Bts was planned for construction in 2025–26.[79] Center bus lanes are also funded for Lynnway in Lynn, and proposed for Blue Hill Avenue in Boston between Grove Hall and Template:Bts.[72][80][81][82][83] Additional lanes in Boston announced in 2020 but not yet implemented include Malcolm X Boulevard between Template:Bts and Template:Bts, Warren Street between Nubian Square and Grove Hall, and Hyde Park Avenue between Forest Hills and Metropolitan Avenue.[84]

In January 2025, the state legislature passed a bill authorizing the MBTA and regional transit agencies to use automated camera enforcement of illegal parking in bus lanes and bus stops.[85] The MBTA proposed regulations and began procurement of an enforcement system later that year.[86][87] Enforcement with advisory notices on route SL4 and SL5 began on October 1, 1026, followed by warnings and fines on January 1, 2027.[88]

References

Template:Reflist

Template:Sister project

Template:MBTA Template:Massachusetts-Rhode Island transit agencies

Template:Authority control

  1. ↑ Template:Cite news Template:Open access
  2. ↑ Template:Cite news Template:Open access
  3. ↑ Template:Cite news
  4. ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 Template:NETransit
  5. ↑ Template:Cite news
  6. ↑ Template:Cite book
  7. ↑ Template:Cite news
  8. ↑ 8.0 8.1 8.2 {{#invoke:citation/CS1|citation |CitationClass=web }}
  9. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  10. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  11. ↑ Template:Cite press release
  12. ↑ 12.0 12.1 {{#invoke:citation/CS1|citation |CitationClass=web }}
  13. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  14. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  15. ↑ MBTA’s ‘aggressive’ year-long bus driver hiring campaign failed. Black and Hispanic riders are paying the price.
  16. ↑ Template:Cite press release
  17. ↑ 17.00 17.01 17.02 17.03 17.04 17.05 17.06 17.07 17.08 17.09 17.10 17.11 17.12 17.13 17.14 17.15 17.16 Cite error: Invalid <ref> tag; no text was provided for refs named roster
  18. ↑ Template:Cite press release
  19. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  20. ↑ 20.0 20.1 20.2 20.3 20.4 20.5 20.6 {{#invoke:citation/CS1|citation |CitationClass=web }}
  21. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  22. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  23. ↑ 23.0 23.1 {{#invoke:citation/CS1|citation |CitationClass=web }}
  24. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  25. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  26. ↑ 26.0 26.1 26.2 {{#invoke:citation/CS1|citation |CitationClass=web }}
  27. ↑ 27.0 27.1 {{#invoke:citation/CS1|citation |CitationClass=web }}
  28. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  29. ↑ Template:Cite AV media
  30. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  31. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  32. ↑ 32.0 32.1 {{#invoke:citation/CS1|citation |CitationClass=web }}
  33. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  34. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  35. ↑ Template:Cite news
  36. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  37. ↑ Template:Cite press release
  38. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  39. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  40. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  41. ↑ Template:Cite press release
  42. ↑ Template:Cite press release
  43. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  44. ↑ Template:Cite press release
  45. ↑ Template:Cite news
  46. ↑ Template:Cite press release
  47. ↑ Template:Cite news
  48. ↑ 48.0 48.1 48.2 {{#invoke:citation/CS1|citation |CitationClass=web }}
  49. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  50. ↑ Template:Cite news
  51. ↑ Template:Cite press release
  52. ↑ 52.0 52.1 {{#invoke:citation/CS1|citation |CitationClass=web }}
  53. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  54. ↑ Template:Cite press
  55. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  56. ↑ 56.0 56.1 56.2 56.3 {{#invoke:citation/CS1|citation |CitationClass=web }}
  57. ↑ Template:Cite press release
  58. ↑ Template:Cite news
  59. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  60. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  61. ↑ Template:Cite press release
  62. ↑ Template:Cite press release
  63. ↑ Template:Cite press release
  64. ↑ Template:Cite news
  65. ↑ Template:Cite press release
  66. ↑ Template:Cite press release
  67. ↑ Template:Cite press release
  68. ↑ Template:Cite news
  69. ↑ Template:Cite press release
  70. ↑ Template:Cite press release
  71. ↑ Template:Cite press release
  72. ↑ 72.0 72.1 Template:Cite press release
  73. ↑ Template:Cite news
  74. ↑ Template:Cite press release
  75. ↑ Template:Cite press release
  76. ↑ Template:Cite news
  77. ↑ Template:Cite press release
  78. ↑ Template:Cite press release
  79. ↑ Template:Cite press release
  80. ↑ Template:Cite news
  81. ↑ Template:Cite press release
  82. ↑ Template:Cite news
  83. ↑ Template:Cite news
  84. ↑ Template:Cite press release
  85. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  86. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  87. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}
  88. ↑ {{#invoke:citation/CS1|citation |CitationClass=web }}